8
COMMISSIONING AND USE
After having positioned the heater, it is necessary to perform the following actions:
8.1
FITTING THE DEFLECTORS AND O
• Open the door.
• Make sure that the flue inspection valve is in closed position with the rod placed in the suitable bracket (Fig. 1).
• Insert in sequence the deflectors and O2 Ring as shown in the diagram (Fig. 2-Fig. 3-Fig. 4).
FIG. 1
5
52
RING (IF PROVIDED)
2
6
FIG. 3
3
FIG. 2
cod. 004777090 MBL - 19/12/2018 - Palazzetti - PN - Italy
230 mm
4
FIG. 4
2
140 mm