Installing An Integral Blower, Model Vtn630C Or Vtn1030C - Thermador Professional PH Série Manuel D'installation

Masquer les pouces Voir aussi pour Professional PH Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wall
1-1/8"
23"
Cooktop
Centerline
3-3/16"
Plan View of Cabinet Cutout
Note:
This figure depicts transition and conduit
locations only. See Figure 2 on page 4 for overall
hood dimensions.
Figure 12: Transition and Conduit Locations
3. For horizontal discharge, use Figure 6 for the geometry
of the cutout required for clearance of the transition.
4. Hang hood from screws and tighten securely.
5. From inside of hood, insert screws supplied. Drill
through holes (use #8 x 5/8" screws supplied), one (1)
on each side and four along the front, into bottom of the
cabinet. See screw holes labeled "L" in Figure 11.
Centerline Hole Dimensions for Figures 11 and 12
HOOD
A (Fig 11)
SIZE
Tap Holes
30"
29-1/16"
36"
35-1/16"
42"
41-1/16"
48"
47-1/16"
54"
53-1/16"
B
2-3/8"
1-7/8"
7-7/8"
2-3/8"
5/8" DIA clearance
holes for 1/2" conduit
to j-box.
B (Fig 12)
Conduit Holes
13-7/16"
16-7/16"
19-7/16"
22-7/16"
25-7/16"
Installing an Integral Blower,
Model VTN630C or VTN1030C
The hood can be installed with a model VTN630C or
VTN1030C integral blower.
Blower Preparation
Wire tie
Capacitor
Blower Front View
1. Remove left and right shipping brackets and discard.
2. Cut wire tie shown in Figure 13. Locate the wire
harness with the Molex 6-pin connector. Route wire
harness out rear of blower, as shown in Figure 14
below.
3. Re-attach wire harnesses to capacitor with new wire tie
(supplied) in same location in front.
4. Attach wire harness with Molex 6-pin connector to
housing as shown in Figure 14 with wire tie (supplied).
Shipping Brackets
Figure 13: Blower Front View
Add wire
Wire
tie here
Harness
Blower Rear View
Figure 14: Blower Rear View
English 9

Publicité

Table des Matières
loading

Table des Matières