Jaga CLIMA CANAL H8 Instructions D'installation page 45

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

18
Mount the valve cover plate. Cover the casing with the protective
cover.
This protective screen must remain on the unit during the
entire construction phase.
20
Fine adjustment to max. 0.8 cm, for a perfect alignment with the
finished floor.
CLIMA CANAL H8 / H10 | MANUAL | 9 MAART 2020, 15:00
19
If screed is used the device needs to be completely insulated in
order to protect the device from voltage differences.
21
Install the grille. Apply the finishing touches .
EN
45

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Clima canal h10

Table des Matières