Gas Piping; Connect The Drain Pipe - mundoclima MUCSR-12-H11 Manuel D'installation Et L'utilisauter

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 86
3.5 Refrigerant pipig work
1) Caution on the pipe handling
Protect the open end of the pipe against dust and moisture.
All pipe bends should be as gentle as possible. Use a pipe
bender for bending.
Rain
Be sure to
place a cap.
If no flare cap is
available, cover the
flare mouth with
tape to keep dirt or
water out.
2) Be sure to insulate both the gas and liquid piping. Use
separate thermal insulation pipes for gas and liquid
refrigerant pipes. See the figure below.
Inter-unit wire
Gas pipe
Gas pipe
insulation
Finishing tape
Piping insulation procedure

Gas piping

1
6
3
2
6
4
A
C
B
1
Piping insulation material(field supply)
2
Flare nut connection
3
Insulation for fitting (field supply)
4
Piping insulation material (main unit)
5
Indoor unit
6
Clamp (field supply)
A
Turn seams up
B
Attach to base
C
Tighten the part other than the piping insulation material
For local insulation, be sure to insulate local piping
all the way into the pipe connections inside the unit.
Exposed piping may cause condensation or may
cause burns when touched.
Make sure that no oil remains on plastic parts of the
decoration panel (optional equipment).
Oil may cause degradation and damage to plastic
parts.
Wall
Liquid pipe
Liquid pipe
insulation
Drain hose
Liquid piping
5
1
6
3
2
6
4
A
C
B
4.

CONNECT THE DRAIN PIPE

Models 12 to 18:
Drain port (OD 25 mm)
Models 24 to 60:
5
59
1-1.5m
(39-59")
Downward slope
1/100
1 - 1.5m
≤30cm (11.8")
(39-59")
≤53cm
(20.8")
22cm
(8.6")
0 - 75mm
(3")
1-1.5m
(39-59")
Downward slope
1/100
1-1.5m
(39-59")
1 - 1.5m
(39-59")
Drain port (OD 25 mm)
≤75cm
(29.5")
≤75cm
(29.5")

Publicité

Chapitres

Table des Matières
loading

Table des Matières