GB
18.
Once the solar-panel system has been checked
for leaks, place the heat-insulation sleeves (12)
on the hydraulic connections, remove the
2
protective film from the self-adhesive sleeve and
stick it over the heat-insulation sleeve.
Insulate the second and any remaining fittings in
the same way.
8980N423
35