TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
Chromium content
Arsenic content
Cadmium content
Mercury content
Lead content
Nickel content
Zinc content
not more than 1% of the pellets may be longer than 40 mm, max. length 45 mm;
1)
dry weight;
2)
particles <3.15 mm, particulate matter, before handing over the goods;
3)
measurements with Ligno-Tester limit value ≥ 97,7% by weight.
4)
4. TRANSPORTATION OF THE BOILER
We recommend to transport the heating boiler to the
installation site in its packaging placed on the pallet.
During transport and installation, depending on the
weight, suitable safety devices should be used in
accordance with Directive 2006/42/EC.
When transporting items weighing more than 30 kg,
the use of pallet jack, fork truck or other hoisting
devices is a must.
Product must be in original packaging following
the instructions on the label - to be protected from
adverse weather conditions (snow, rain and dust)
from the shocks, and other activities likely to cause
damage. In case of malfunction of the fan or the
Table 4. Overall dimensions of Set Pellet boiler PelleBurn, Pellet burner Pell and Fuel Hopper FH 500
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging upon
delivery.
• Check whether all components have been
delivered to you.
Boiler consignment package includes:
1) Pellet boiler PelleBurn with pellet burner Pell
2) Auger
mg / kg
2)
mg / kg
2)
mg / kg
2)
mg / kg
2)
mg / kg
2)
mg / kg
2)
mg / kg
2)
PelleBurn
Pellet boiler, burner and pallet
A1, mm
A2, mm
Auger, box
A3, mm
Fuel Hopper, box
Pellet boiler, burner and pallet
B1, mm
B2, mm
Auger, box
B3, mm
Fuel Hopper, box
C, mm
Pellet boiler, burner and pallet
Pellet boiler, burner and pallet
D1, mm
D2, mm
Auger, box
D3, mm
Fuel Hopper, box
Pellet boiler, burner and pallet
Auger, box
Weight, kg
Fuel Hopper, box
≤ 10
≤ 10
≤ 1,0
≤ 1,0
≤ 0,5
≤ 0,5
≤ 0,1
≤ 0,1
≤ 10
≤ 10
≤ 10
≤ 10
≤ 100
≤ 100
motor drive (noise, friction) or failure of high-tech
elements such as broken controller-screen, contact
your nearest authorized service center for repairs
and maintenance.
The boiler is securely fastened with fasteners to a
wooden pallet.
Important: When installing the boiler, the
wooden pallet onto which the boiler is
placed must be removed by unscrewing
the bolted connections using flat ring
wrench S13.
Diagram 5. Indications dimensions /see
page 59/
15
25
710
710
120
120
840
840
1100
1100
260
260
810
810
125
125
1430
1630
1700
1700
1220
1220
185
200
8
8
48
48
3) Fuel hopper FH 500 (option)
4) Safety valve 3 bar.
5) Fire irons
6) Technical passport. Installation and operation
manual
7) Service booklet and Warranty card
If any of the above items are missing, contact your
supplier.
7
≤ 10
≤ 1,0
≤ 0,5
≤ 0,1
≤ 10
≤ 10
≤ 100
40
810
120
840
1320
260
810
125
1775
1700
1220
325
8
48
EN