Télécharger Imprimer la page

Fleurco Novara NOV24836-CW Guide D'installation page 12

Publicité

6
RUNNING RAIL INSTALLATION / INSTALLATION DE LA BARRE DE ROULEMENT
Unfasten the set screws (x4) from the wall bracket (15). Then remove the back plate from the wall bracket and set it aside.
6a
With the back plates of the wall and the glass brackets removed, slide the wall brackets away from the ends of the running rail (14).
6b
Align running rail holes with holes in fixed panel. Install glass fasteners (16) to join fixed panel (12) and rail (14). Be sure to place
6c
gaskets between all contact between glass and metal parts.
Fasten with the 3mm hex key.
6d
Dévisser les vis du support murales (15). (x4) Retirer la plaquette et le support mural (x2), et la mettre de côté.
6a
Avec les plaquettes retirées du support, glisser les supports muraux le long de la barre de roulement.
6b
Aligner les trous de la barre de roulement avec les trous du panneau fixe. Installer les supports de vitre (16) pour joindre le
6c
panneau fixe (12) à la barre de roulement (14). Assurer d'avoir un joint situé aux contacts entre la vitre et le métal.
Serrer à l'aide de la clé hex 3mm.
6d
12
6b
15
6c
INTERIOR
SHOWER SIDE
INTÉRIEUR DE
LA DOUCHE
16
INSTRUCTION MANUAL - GUIDE D'INSTALLATION
12
14
6a
14
6d
18
INTERIOR
SHOWER SIDE
INTÉRIEUR DE
LA DOUCHE

Publicité

loading

Ce manuel est également adapté pour:

Novara nov26036-cw