C
OMMISSIONING
Measures to be taken before fluidic commissioning
Check the connections, voltage and operating pressure!
Make sure that the max. operating data (see rating plate) are not exceeded!
Check allocation according to instructions of ports 1 and 3 or 5: these shall under no circumstances be
swapped!
For electrical operation, unlock the manual override!
Fluidic commissioning
Switch on the pressure supply.
Only then switch on the voltage!
CO 2
bar
Operating Instructions No. 804 090