Installation
1. Install 738 or 739 engine as per instructions supplied
with engine. Install RF24B engine and RA24ZC zero
clearance box as per instructions supplied with
each.
2. Install 2 mounting brackets (supplied with heater
or ZC kit) to the back of the square trim using the
machine screws provided.
3. Fasten square trim assembly to heater using 4
screws.
4. Clip the selected front (supplied separately) onto the
mounting brackets within the square trim.
5. Finish the front installation according to instructions
packed with each front.
Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.
Designed and Manufactured by / for
Miles Industries Ltd.
190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1
Tel. 604-984-3496 Fax 604-984-0246
www.valorfireplaces.com
2
Fasten brackets (supplied
with heater) to back
of trim using screws
provided
Fasten trim &
brackets to heater
using 4 screws