Télécharger Imprimer la page

HBM C16i Serie Notice De Montage page 14

Publicité

Mounting
12
4.1
Mounting procedure
Below, we use a weighbridge as an example for the me­
chanical installation. We recommend that you proceed as
follows:
S Use appropriate lifting gear to lift one face of the
weighbridge that has already been centered.
S Prepare the load introduction parts and mount the part
with the rotation stop dowel pin below and the load
introduction part without the dowel pin above. The
lower load introduction part must be aligned such that
the dowel pin points in the direction in which, later on,
the cable outlet and the type plate are to be point,
although do not yet finally fix it.
CAUTION
Position of rotation stop dowel pin:
Radially position open side!
S Use a sufficient amount of the grease provided with
the load cells to protect from wear, tear, dirt and
corrosion the upper and lower load introduction parts
in the load carrying element, the dowel pin and the
rotation stop on the load cell.
A1461-2.0 HBM: public
or
C16i

Publicité

loading

Ce manuel est également adapté pour:

C16i d1C16i c3