Télécharger Imprimer la page

LSL 121B029 Instructions De Montage page 7

Publicité

Installation notes for wires, cables and hoses:
Throttle cable: Route the throttle cable, as
shown, on the shortest way to the tank
cover. Check throttle cable for free
movement on every steering angle.
Brake and Clutch hoses: Route them as shown in the picture. Lay clutch hose above the
fairing support and fix it with a cable tie (see  in the picture above). Fix throttle cables and
clutch hose with a cable tie so they won't touch the steering damper!
Handlebar Control harnesses: Unwrap the harnesses at the branching points and shorten
the down leading tubes by 2cm. Spread the wires and seal the new branching points with
insulating tape.
Make sure that no cable, hose or harness is bended and stays tension-free over the
whole steering angle.
The Superbike Conversion kit is now installed correctly.
We, the team of LSL Motorradtechnik Germany, wish you enjoyable driving!
————————————————
Rev. 00 18/04/2012
Accessories from
The Original
Page 3 of 3
——

Publicité

loading

Produits Connexes pour LSL 121B029