Translation of the original instructions
To replace it, you must :
- Remove the protection,
- Remove the ferrite on copper with a heat gun to facilitate the removal of the resin,
- Clean copper,
- Glue the ferrite with the specific resin,
- Reposition the ferrite with its protection,
- Waiting for the complete setting of the adhesive before using the inductor.
Inductor
056862
056879
056886
Option
Preventive maintenance
Meticulous inspections should be carried out at regular intervals to quickly detect and eliminate faults, so they will not
cause damage to the device.
Prior to each use of the POWERDUCTION 50LG, check the unit's security systems and any anomalies
that may hinder the proper operation of the device. Perform daily checks to identify signs of wear.
The operational safety of the product can only be guaranteed if the repairs are carried out using
original spare parts, and if the maintenance instructions are followed.
After each use and once the product is switched off, it should be cleaned immediately to remove any
dust or dirt that may impair cooling efficiency, affect the proper functioning of the product and re-
duce its lifespan.
Before each use, check the good operation of the main systems, security systems, and all the elec-
trical cables connection.
Perform periodic visual inspections to verify that there are no cooling liquid leaks, and check that the
vents are not obstructed.
All manuals and user guides at all-guides.com
POWERDUCTION 50LG
ACCESSORIES POWERDUCTION 50LG
Ferrite
053823
053823
053458
Glue Stick-Power Bi-component Epoxy 150 ° C
Ref : 054851
Gallows - Cable carrier
Ref : 052284
Protection
056909
056909
056916
EN
25