Wiring System
......
PV Strings
Power meter
Main breaker
CT2
CT1
Meter CT
Communication
AC Breaker
AC output breaker
07
Powering On the System
1. Close the AC breaker between inverter and
the grid.
2. Turn on the DC switch.
3. Observe operation status of the inverter via
LED indicators.
4. Set the right safety code on PV Master app.
Grid
Load
Safety code:
After connecting Solar-WiFi* (*The Wi-Fi
signal is named the last 8 characters of the
inverter's serial No.), check on PV Master
App "Parameters" to make sure the "Safety
Code" Setting is right. Please set it right in
"Settings" if the setting is not right.
System Data
PV Input
On-Grid Output
FOut
Import Power
Inverter
S/N:
Firmware Version
Safety Code
IEEE1547 240Vac
Work Status