Page 2
Product Overview Wi-Fi LED Indicators Reset/Reload DC switch[1] On-Grid terminal (GRID) PV input terminal (PV INPUT) Ground bar Ground bar EMS (EMS) [2] Meter CT terminal (Meter) Hole for Hole for connecting cable connecting cable Port for connecting WiFi Module Note: [1] DC switch: DC switch is used to shut down the PV system in case of emergency.
Page 3
Installation Requirements Install the inverter Fasten screws Installation angle Installation space 500mm (19.69 in.) (7.87 in.) (7.87 in.) (11.81 in.) 200mm 200mm 300mm Inverter could be locked for anit-theft (11.81 in.) 300mm Installation angle (7.56 in.) 415mm (16.34 in.) 192mm (19.69 in.) Upward----------500mm (11.81 in.)
Page 4
Avant de commencer l’installation ou la mise en service de A-MS, DANGER! PV cable assembly and connection veuillez lire attentivement les déclarations ci-dessous. Max 5.6mm (0.22 in.) DANGER! • Pendant la connexion au câblage, l’opérateur doit toujours 90℃ wire, 12AWG copper porter un EPI approprié.
Page 5
On-grid cable assembly and connection System Connection Diagram Max 7.4mm (0.29 in.) This diagram is an example for US split-phase grid system. 90℃ wire, 8-10AWG copper 18mm (0.71 in.) Cable Terminal CT connection Grid Power Meter CT 2 CT 1 CT 1 connect to L1 WiFi module CT 2 connect to L2...
Page 6
Wiring System Powering On the System 1. Close the AC breaker between inverter and Safety code: the grid. After connecting Solar-WiFi* (*The Wi-Fi 2. Turn on the DC switch. signal is named the last 8 characters of the 3. Observe operation status of the inverter via LED indicators.