Télécharger Imprimer la page

Woodbridge EBT230 Guide D'installation Et De Maintenance page 11

Bidet de toilette électronique

Publicité

1. Installation of angle valve
• Draw drain outlet centerline on the floor.
Install the angle valve in the appropriate
position on the wall, based on the
dimensions of the toilet.
Equipped with three-way angle valve
Line
Installation Method 1:
Installation Method 2:
Note:
1. Please use the supplied angle valve when
installing this toilet. Use of other angle valves
not including a filter may result in blockages
in the toilet and bidet waterways.
2. If replacing an existing angle valve, please
contact a professional for installation.
2. Cardboard Installation Template
• Align cardboard with the centerline of the
drain outlet.
• Draw contour lines according to cardboard.
305mm
Drain outlet
NPT 1/2
5/8ʹʹ
Drain outlet
www.woodbridgebath.com
Toilet installation
3. Installation of battery box
(Suitable for function with power off flush.)
• Before activating the power-off flushing
function, it should install the 9V battery
into the battery box and close the box
cover in advance.
• Take out the battery connection cable
from the rear side of seat cover. And
connect it to the female end of the
battery box, ensuring that it is plugged
in place.
• Remove the sticker on the velcro at the
bottom of the battery box and place it on
the proper position of the ceramic back
for easy removal.
battery
48.5mm
46.4mm
Note:
1. It is recommended to hire professional
personnel for this operation.
2. It is recommended to use 9V high-quality
dry battery, such as models 6LR61 or 6F22.
3. There is no battery installed in the battery
box in the configuration. It should be
purchased by the customer before installation.
4. It is recommended to replace the battery
every two years, otherwise there may be a
risk of leakage.
17.5mm
Male
buckle (+)
Female
buckle (-)
10

Publicité

loading