Oase Filtral UVC 700 Notice D'emploi page 10

Masquer les pouces Voir aussi pour Filtral UVC 700:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

- English -
3. Important: Guide the connection cable (I) through
the cable opening at the bottom strainer casing
(D) and clip with the cable kink protection (J) in
the bottom strainer casing.
● Attach the top strainer casing (H) and press
down onto the bottom strainer casing (D) until the
clamps engage in the bottom strainer casing.
Reassembling the unit
Filtral UVC 1200
1. Attach the pump (B) to the UVC water
housing (A) using the union nut.
2. Place the bio surface element (D) and
gravel bags (E) in the bottom strainer
casing (C).
● If an air pump was installed: Place the
aeration stone (F) between the gravel
bags (E). Ensure that the hose is not
kinked.
● Place the foam filters (G, H) in the
bottom strainer casing (C) as shown.
● Insert the UVC clarifying unit including
the pump (A,B).
3. Important: Lead the connection cable
through the cable opening (I) in the
bottom strainer casing and route the
cable such that pinching is avoided.
● Attach the top strainer casing (J) and
press down onto the bottom strainer
casing (C) until the clamps engage in
the bottom strainer casing.
3.
H
1.
A
B
F
3.
J
D
I
A,B
2.
G
C
D
E
I
J
H
H
C
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Filtral uvc 1200

Table des Matières