Télécharger Imprimer la page

SolaX Power X1-IES Serie Manuel D'installation page 170

Publicité

4
Set the System ON/OFF to ON state on the LCD screen.
Turn on AC breaker
5
2
6
• After the installation is complete, cut off the AC breaker between Grid terminal and
the grid, and then switch on all the EPS loads to ensure that the system work properly.
Repeat the above operations each time the load on the EPS terminal increases.
* Refer to user manual for more information about powering on the system.
==System ON/OFF====
>Switch:
> ON ﹤
Grid-L Grid-N
AC breaker
L
N
Main
breaker
1
Press and hold the BAT BUTTON for at least 2 seconds.
NOTICE!
167

Publicité

loading