Step 2 Install the bracket of the top battery module
Attach the two brackets with a
1
screw, but do not tighten it for a
while.
1
3
Align the brackets with the holes on the inverter. Mark four
dots through the brackets on the wall.
4
*Align the positioning cardboard with the bottom two holes.
*When drilling holes, make sure the already installed part is covered to prevent dust from
falling onto the device.
132
M5*14
2
2.0±0.1 N·m
5
Mark dots where "X1-IES" is noted on the
marking cardboard.
6
Ø10 drill
Depth: >60 mm