E
N
Model assembly
Pitot tube installation
1.Insert the pitot tube to the nose slot as shown.
Battery installation
1. Pull back on the release button and remove the cockpit.
2.Slide the battery into the battery hatch with the power supply
cable toward the rear end of the plane and the hook tape facing
the bottom of the battery hatch.
Note: You may need to relocate the battery position to acheieve
the correct CG for your model.
Receiver wiring diagram
The cables from the servo connector board should be
connected to your receiver in the order shown. Note that the
rudder channel controls both the steering servo and the rudder
surface. The LEDs can be powered by any spare channel on
the receiver. Tuck the wire leads into the recessed cavity
towards the rear of the battery hatch.
Flap
6