Installation precautions
1. Improper installation will result in lift damage or personal injury. The manufacturer will not be
liable for any damage caused by improper installation or use of this product, either directly or
indirectly.
2. The proper installation location should be the "level" ground and ensure a horizontal lifting. In
case of slight inclination in the ground, the appropriate thin pad may be used. Any great inclination
will affect the height of the pad or the horizontal lifting performance of the product. If the floor
is suspected to be slanted, a visual inspection may be carried out, or, where possible, a new
horizontal concrete slab may be fabricated. In brief, the maximum horizontal lifting height of
the lift in the best horizontal lifting state can only be up to that when the lift is installed on the
horizontal ground. Do not expect to compensate for severe inclination.
3. Do not install the lift on any asphalt surface. According to the minimum specifications specified
in the general floor requirements, do not install the lift on any surface, except for concrete surface.
Do not install the lift on the cracked or defective concrete surface. Please inspect the mounting
position together with the architectural engineer.
4. Do not install the lift on the first floor of the building with a basement without the written
approval of the architectural engineer.
5. Overhead obstacle: The mounting area of the lift shall be free from any overhead obstacles such
as heaters, building supports, electrical piping, etc.
6. Ground drilling test: The installation personnel may identify the concrete thickness of each
site by a ground drilling test. If more than one lift is to be installed at the same place, it is best to
perform ground drilling test in each specific site.
7. Power: Prepare proper power before installation. It is recommended to have the electrical wiring
done by the certified electrician.
Installation procedures
Select the mounting position of the lift according to the requirements listed below:
1. The lift can only be installed on the concrete slab with a minimum thickness of 500mm and a
minimum curing time of 7 days.
2. The concrete slab shall be reinforced with the reinforcing bar.
3. The concrete slab must be placed horizontally.