Télécharger Imprimer la page

Vaisala PR53GC Guide D'installation page 14

Publicité

3. Weld the ferrule into the process pipeline.
a2
100°
For optimal self-cleaning properties, install the refractometer in a 10 °
downward angle.
4. Install the O-ring and tighten the clamp bolts to 44 Nm with a 17‑mm wrench. Make sure
the cable glands on the refractometer are in a downward position.
5. Make sure the refractometer is firmly in place and that there is no excessive vibration.
Support the piping if needed.
Installing refractometer with flow cell
Plan the installation location carefully before installation. See
(page
10).
14
/
Choosing the installation location
M212931EN-C

Publicité

loading