Cable Management
CAUTION: Don't insert extension cords. Don't insert any cord
connecting one workstation to another.
1
Route power and monitor cables through the flexible Cable
Clips (A) on the Upper Link.
2
Slide the Cover (B) off of the Angled Link.
3
Route cables into the Angled Link and replace the Cover, sliding
until it clicks into place
4
Route cables through any remaining links used in your configuration
following the same procedure from steps 2-3.
②
③
B
①
A
7