MCBF
Models
Length - Weight
Cycles
Installation in windy area (%)
The percentages indicate how much the number of cycles should be reduced in relation to the type and
number of accessories installed.
Before carrying out any cleaning or maintenance, or replacing any parts, disconnect the device from
the power supply.
This document informs the installer of the checks that must be carried out during maintenance.
If the system is not used for long periods of time, e.g. for installations at sites with seasonal closures,
disconnect the power supply. When the power supply is reconnected, check the system is working
correctly.
For information on correct installation and adjustments, please see the product installation manual.
For information on choosing products and accessories, please see our product catalogue.
Every 10,000 cycles and, in any case, every 6 months of operation, you must perform the maintenance
work indicated below.
Perform a general and complete check of the tightness of the nuts and bolts.
Grease all of the moving mechanical parts.
Check the warning and safety devices are working properly.
Check for any wear on the moving mechanical parts and check that they are working properly.
Check the release mechanism is working efficiently by performing a manoeuvre with the leaf free. The gate leaf
must not be obstructed.
Check the cables are intact and connected correctly.
Check and clean the track guide and rack.
BXV04AGF
BXV06AGF
14 m - 400 kg
18 m - 600 kg
150000
-15 %
BXV10AGF
20 m - 1000 kg
150000
150000
-15 %
-15 %