Télécharger Imprimer la page

Panasonic FV-06VE1 Guide D'installation page 8

Publicité

INSTALLATIONⅠ (CEILING MOUNT) / INSTALLATIONⅠ (MONTAGE AU PLAFOND)
1. Finish ceiling work.
EN
Edge of ceiling drywall or other ceiling covering
must be behind the ange on the ERV housing.
2. Insert the grille mounting springs into the slots as
shown and mount grille to the appropriate direction.
If the grille is mounted in the opposite
Note
direction, the grille cannot be tted to the
wall, so then reverse the grille position
and try to mount again.
Unit: inches (mm)
Unités: po (mm)
EN
Completed Image
[Optional]
EN
Attach the switch labels on the wall switch
as shown in the diagram for clearer indication.
Ceiling
Plafond
Ceiling hole size
Taille du trou au plafond
Ceiling
Plafond
Supply air enclosure
Grille
Boîtier d'air fourni
Grille
1. Terminez la nition au plafond.
FR
Le bord de la cloison sèche ou de tout autre
revêtement de plafond doit se trouver derrière la
bride du boîtier du VRE.
2. Insérez les ressorts de xation de grille dans les
fentes comme illustré et xez la grille dans le bon sens.
Si la grille est installée dans le sens opposé,
Nota
elle ne pourra pas être xée au mur, le cas
échéant, inversez la grille et essayez de
l'installer à nouveau.
Mounting spring
Ressort de xation
FR
Vue d'achèvement
Ceiling
Plafond
[En option]
FR
Fixez les étiquettes de commutation sur
l'interrupteur mural comme l'indique le schéma
pour une indication plus claire.
ON
HI
STANDBY
LO
Switch labels
Étiquettes de commutation
8

Publicité

loading