Télécharger Imprimer la page

LG LMU186HV Manuel D'instructions page 36

Masquer les pouces Voir aussi pour LMU186HV:

Publicité

Flaring Work and Connection of Piping
Flaring work
Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the
following procedure.
1) Cut the pipes and the cable.
I Use the accessory piping kit or the pipes
purchased locally.
I Measure the distance between the
indoor and the outdoor unit.
I Cut the pipes a little longer than
measured distance.
I Cut the cable 1.5m(4.9ft) longer than the
pipe length.
2) Burrs removal
I Completely remove all burrs from the cut
cross section of pipe/tube.
I Put the end of the copper tube/pipe to
downward direction as you remove burrs
in order to avoid to let burrs drop in the
tubing.
3) Putting nut on
I Remove flare nuts attached to indoor
and outdoor units, than put them on
pipe/tube having completed burr
removal.
(Not possible to put them on after flaring
work)
4) Flaring work
I Carry out flaring work using flaring tool
as shown below.
Outside diameter
mm
inch
mm
Ø6.35
1/4
1.1~1.3
Ø9.52
3/8
1.5~1.7
Ø12.7
1/2
1.6~1.8
Firmly hold copper tube in a bar(or die) as
indicated dimension in the table above.
5) Check
I Compare the flared work with figure.
I If flare is noted to be defective, cut off
the flared section and do flaring work
again.
Flaring Work and Connection of Piping
Copper
tube
Point down
Copper tube
Bar
A
inch
0.04~0.05
Copper pipe
0.06~0.07
0.06~0.07
Smooth all round
Even length
all round
Slanted Uneven Rough
90°
Pipe
Reamer
Flare nut
Handle
Bar
"A"
Yoke
Cone
Clamp handle
Red arrow mark
Inside is shining without scratches.
= Improper flaring =
Inclined
Surface
Cracked Uneven
damaged
thickness
Installation Manual 35

Publicité

loading