Télécharger Imprimer la page

Publicité

Liens rapides

Set-up Instructions
QC605
QC605B
QC620
Part Number: Z97125_SI
Rev Aug-2019

Publicité

loading

Sommaire des Matières pour Wallenstein QC605

  • Page 1 Set-up Instructions QC605 QC605B QC620 Part Number: Z97125_SI Rev Aug-2019...
  • Page 2 (23 kg) or more to avoid back injury. All lifting devices (straps, slings, chains, ratchet blocks) must comply with applicable local regulations and certifications. Wallenstein Equipment Inc. cannot accept responsibility for the use of sub-standard equipment and work practices. Use lifting equipment with a capacity greater than the weight of the component.
  • Page 3 QC605 QC605B QC620...
  • Page 8 Pre-delivery Inspection Inspect for damage from shipping. Immediately contact the shipping company if damage is found. QC600 – Series Skid Steer Mounted Backhoe Check hydraulic hoses Check bucket function Check that all fasteners are tight Lubricate pivot points Safety Checks All Safety decals are clean and legible Check that hydraulic connections are tight Check that hydraulic lines are in good condition...
  • Page 9 Bolt Torque Specifications Imperial Bolt Torque Specifications Checking Bolt Torque Torque Value The tables shown give correct torque values for Bolt SAE Gr. 2 SAE Gr. 5 SAE Gr. 8 various bolts and capscrews. Tighten all bolts to the Diameter torque values specified in the table, unless indicated lbf•ft N•m...
  • Page 10 Hydraulic Fitting Torque Hydraulic Fitting Torque 1. Check flare and flare seat for defects that might cause leakage. Hex Size Tube Size Flats From Finger Across Torque value 2. Align tube with fitting before tightening. Tight Flats 3. Hand-tighten swivel nut until snug. lbf•ft Inches Inches...

Ce manuel est également adapté pour:

Qc605bQc620