MAINTENANCE (continued)
4.
Unplug the electrolytic cell cord. Unscrew the electrolytic cell nut in a counter-clockwise motion.
5.
Pull out the electrolytic cell and place it in a container, pour kitchen grade vinegar into the container to
soak the titanium plate for about one hour until no deposits remain.
6.
Remove the electrolytic cell and fl ush the titanium plate with fresh water. Be careful: Keep the
electrolytic cell receptacle completely dry, do not let it come into contact with the vinegar and water.
7.
Reverse the above steps to reinstall the electrolytic cell.
NOTE: Ensure the notch on the electrolytic cell is aligned with the ridge on the electrolytic cell housing.
TEST STRIPS ( PACKED WITH THE PRODUCT )
INTEX
®
The Test Strips can test the "Free Chlorine", "pH", "Total Alkalinity" and "Calcium Hardness" levels at the
same time. We recommend that you test the water chemistry weekly, and maintain the chlorine
concentration at 2-4 ppm.
Directions and Use
1.
Dip the entire strip into the water and remove immediately.
2.
Hold the strip level for 15 seconds. Do not shake excess water from the strip.
3.
Now compare the strip pad to the color chart on the packaging label. If necessary, adjust the chemical
level in the spa water. It is very important, to use the proper technique when testing the water's
chemical level. Read and follow the written strip instructions carefully.
S AVE THESE INSTRUCTIONS
(353IO) SPA ENGLISH 7.5" X 10.3" PANTONE 295U 11/19/2021
353
English
A
Page 27