Télécharger Imprimer la page

Hülsta NEO Notice De Montage page 56

Masquer les pouces Voir aussi pour NEO:

Publicité

MONTAGE · ASSEMBLY · MONTAGE · MONTAGE
Attention! The nature of the wall must be checked carefully by qualified personnel before assembly. Assembly may then only be carried out by qualified persons
carefully observe these assembly instructions. The set of assembly mortar mat. no. 1535747 must be used if the characteristics of the wall and the pressure resistance levels
are as stated in the table below. The unit must not be assembled on light walls or masonry. In all other cases it is essential that a different and appropriate type of mounting
is chosen by a qualified person. hülsta cannot be held responsible for the correct choice of a different method of mounting. Please note that if the units are not mounted
properly on the wall, there is a risk of the units falling down or tipping over – especially when alternative mounting materials acquired on site have been used.
Generally speaking, you as a dealer/qualified fitter are responsible for the correct wall mounting of the units.
During assembly please also make sure that there are no electrical installations or other utility lines near the mounting area. This must be checked using an appropriate
search device. Please note that plastic pipes will not be detected.
Assembly with anchor sleeve FIS H12 x 85 K
Perforated brick
Vertically
perforated
brick
Perforated
sand-lime
brick
Hollow bricks
of lightweight
concrete
Assembly without anchor sleeve FIS H12 x 85 K
Solid brickwork
Concrete
Wall bricks
Sand-lime
brick
Solid brick
of light
concrete
SEITE 56
MONTAGEANLEITUNG
HÄNGEELEMENT - BENÖTIGTE
WANDBESCHAFFENHEIT
WALL UNIT - REQUIRED STRUCTURE OF WALL
ELEMENT SUSPENDU - CARACTERISTIQUES INDISPENSABLES POUR LA COMPOSITION DU MUR
HANGELEMENT - VEREISTE WANDSTRUCTUUR
The set is only suitable for use in connection with the types of walls stated below. Please note that the
pressure resistance levels must under no circumstances fall below those stated.
HLz12
Pressure resistance
>/= 12 N/mm²
Tightness
>/= 1 kg/dm³
KSL12
Pressure resistance
>/= 12 N/mm²
Hbl2
Pressure resistance
>/= 2 N/mm²
Pressure resistance
 C12/15
>/= 15 N/mm²
Mz12
Pressure resistance
>/= 12 N/mm²
KS12
Pressure resistance
>/= 12 N/mm²
V2
Pressure resistance
>/= 2 N/mm²
Porous
PP2
Pressure resistance
>/= 2 N/mm²
concrete
Please observe assembly instructions mat. no. 1537293 of Fischer Co.
included with the set in order to guarantee safe assembly!
Set of assembly mortar mat. no. 1535747
(sufficient for 9 mountings)
9x
Static mixer
FIS H12 x 85 K
9x
FIS E 6x75 K
Recommended kind of drilling:
Note:
Recommended kind of drilling:
Note:
Recommended kind of drilling:
Note:
qualified persons who
2x
1x
Rotary drilling: With a normal power drill without percussion
setting in perforated bricks (so that the connecting sections do not
break and the hollow section becomes too large). Drilled holes should
be thoroughly cleaned after drilling by blowing or sucking out any
remains.
The set can be used on walls up to a max. 15 mm of plastering or on any
other non-load bearing surfaces. If this limit is exceeded it may
be necessary to use different mounting methods.
Hammer (impact) drilling: Drilling with a hammer drill (high setting,
better drilling progress) for holes which need to be of a high quality.
Suitable for solid walls with a dense structure (concrete, etc). Drilled
holes should be thoroughly cleaned after drilling by blowing or sucking
out any remains.
Percussion drilling: Drilling with a percussion drill (low setting)
for brickwork of a dense structure (solid bricks, solid sand-lime bricks).
Drilled holes should be thoroughly cleaned after drilling by blowing or
sucking out any remains.
The set can be used on walls up to a max. 15 mm of plastering or on any
other non-load bearing surfaces. If this limit is exceeded it may
be necessary to use different mounting methods.
Rotary drilling: With a normal power drill without percussion
setting in porous concrete. Drilled holes should be thoroughly cleaned
after drilling by blowing or sucking out any remains. This applies to
all materials stated, however particular care should be taken when
cleaning holes drilled in porous concrete!
The set can be used on walls up to a max. 15 mm of plastering or on any
other non-load bearing surfaces. If this limit is exceeded it may
be necessary to use different mounting methods.
NEO

Publicité

loading