standard checklist
EN
1.2
installation overview
3
6
2
4
9
8
7
5
1
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Install rough framing (see "rough framing" section).
3. Place the appliance in its fi nal position.
4. Install appliance venting (see "venting installation" section).
5. Install all electrical wirings (see "electrical information" section).
6. Install gas lines (see "gas installation" section).
7. Test appliance.
8. Complete framing (see "fi nish framing" section).
9. Complete fi nishing (see "fi nishing" section).
6
W415-1847 / A / 03.11.19