- English -
Installation (cont.)
6. Insert 2 temporary nails into the top corner hole of the
flange. Then hold the nails in place with your hand,
and push each nail through the liner.
Notes: Temporary nails are NOT INCLUDED.
7. Assemble the anchoring flange onto the spillway flange
to securely seal the liner to the spillway.
○ Carefullly install the screws, then remove the
temporary nails and attach the last two screws.
○ Tighten all of the screws.
8. Connect tubing to the outlet adapter, then use a hose
clamp hold it tight.
○ Connect the other side of the tubing to the pump, and use
a hose clamp hold it tight too.
NOTE: Tubing, hose clamps and pump are not included.
9. Put the bio-media balls inside spillway.
NOTE: The bio-media can stay inside the bags.
10. Place the filter pad over bio-media ball bags and spillway.
11. Slide 2 clips on the cover, then snap them to the spillway.
12. Carefully cover the waterfall spillway and tubing with
natural material for a professional look.
Questions, problems, missing parts?
Before returning to your retailer, call us at 1-866-627-3435, 8 a.m.-6 p.m., EST, Monday-Friday, or
email us at customercare@oase-livingwater.com. Or visit our website at www.oase-livingwater.com
6.
7.
8.
9.
11.
clip
12.
Temporary nail
Temporary nail
Spillway
Tubing
Hose
clamp
10.
cover
clip
7