- English -
Installation (cont.)
For installation outside the liner
●
After completing the section "Assembling the Spillway
with Filtration"
1. Connect tubing to the outlet adapter, then use a hose
clamp hold it tight.
○ Connect the other side of the tubing to the pump,
and use a hose clamp hold it tight too. Place the pump
in the pond.
NOTE: Tubing, hose clams and pump are not included.
2. Put the bio-media balls inside spillway.
NOTE: The bio-media can stay inside the bags.
3. Place the filter pad over bio-media ball bags and spillway.
4. Slide 2 clips on the cover, then snap them to the spillway.
5. Continue building the rest of the structure. Carefully
cover the waterfall spillway and tubing with natural
material for a professional look.
NOTE: Design the structure to fit the tubing through the
back without any kinks.
Questions, problems, missing parts?
Before returning to your retailer, call us at 1-866-627-3435, 8 a.m.-6 p.m., EST, Monday-Friday, or
email us at customercare@oase-livingwater.com. Or visit our website at www.oase-livingwater.com
1.
2.
3.
4.
clip
5.
cover
clip
5