Télécharger Imprimer la page

GENERGY CUBE 2 Serie Instructions D'utilisation page 55

Publicité

Les langues disponibles

Les langues disponibles

4. Checks prior to operation
4.1 Battery connection (only electrical models with electrical startup).
Before charging the electrolyte and
connecting the battery, check that the
engine switch is in the "OFF" or "0"
position.
If
you
have
any
identifying the engine switch, check
chapter 3.1 PANEL CONTROL.
Loosen the support fastening bolts for
the battery, extract and connect the
the
negative
terminal.
positive terminal is supplied connect
from factory.
NOTE: Check the polarity of the cables, connect the red (+) cable to the red
(+) terminal of the battery and the black (-) cable to the negative (-) of the battery.
NOTE: Be careful not to make any undesired contacts with the battery
terminals and cables, between them or against a metal part of the machine.
questions
on
Normally
54
BATTERY TERMINALS
FASTENING BOLTS

Publicité

loading