table of contents
EN
general information
1.0
1.1
rates and effi ciencies
1.2
installation checklist
1.3
installation overview
1.4
rating plate/lighting instruction
location
1.5
mobile home installation
1.6
hardware list
1.7
lifting handles installation/removal 11
2.0
dimensions
3.0
minimum venting requirements 13
3.1
typical venting installation
3.2
minimum air terminal location
clearances
3.3
horizontal termination (natural gas) 18
3.4
vertical termination (natural gas)
4.0
rough framing - before appliance
installation
4.1
minimum framing dimensions
4.1.1 minimum clearance to combustible
enclosures
4.2
front frame installation
5.0
venting installation
5.1
fi restop spacer assembly
5.2
horizontal installation
5.3
vertical installation
5.4
using fl exible vent components
5.4.1 horizontal air terminal installation
5.4.2 vertical air terminal installation
5.4.3 appliance vent connection
5.5
restricting vertical vents
5.5.1 TLV50
5.5.2 TLV62 / TLV74
5.6
vent shield installation
6.0
electrical information
6.1
hard wiring connection
6.2
receptacle wiring diagram
6.3
in the event of a power failure
6.4
battery holder/switch installation
6.5
initializing the battery holder/switch
for the fi rst time
6.6
access panel
6.7
wiring diagram
6.8
eFIRE application controller
6.8.1 TLV50 wiring diagram
6.8.2 TLV62 / TLV74 wiring diagram
note:
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel Ltd. reserves
the right to change or modify any information within this manual at any time without notice. Changes, other than
editorial are denoted by a vertical line in the margin.
4
W415-4121 / B / 04.20.23
5
7.0
gas installation
6
8.0
operation
7
8.1
pilot-on-demand
8
9.0
nailing tab installation
10
10.0
finish framing - after appliance
11
installation
11
10.1
framing with non-combustibles
12
11.0
finishing
11.1
fastener placement restriction
11.2
fi nishing with non-combustibles
15
11.3
installing non-combustible board
11.4
minimum combustible mantel
17
clearances
11.5
TV mounting restrictions (without
20
DHC™)
11.6
safety barrier installation / removal 51
21
11.7
fi rebox glass door installation /
removal
22
11.8
media installation / removal
11.9
media tray removal
23
11.10
adjusting the fi nishing trim
24
12.0
adjustments
12.1
restricting vertical vents
25
12.2
venturi adjustment
12.3
pilot burner adjustment
25
12.4
fl ame characteristics
27
13.0
maintenance
28
29
13.1
annual maintenance
29
13.2
control access
30
13.3
burner removal
13.4
valve removal
30
13.5
control module removal
31
13.6
LED replacement
31
13.7
glass / door replacement
31
13.8
care of glass
32
13.9
care of plated parts
33
14.0
replacement parts
33
14.1
overview
33
14.2
burner components
33
15.0
troubleshooting
34
16.0
warranty
34
35
36
36
37
38
39
40
41
42
43
43
45
45
46
48
49
50
51
53
54
54
55
55
55
56
56
57
58
58
59
59
60
61
62
62
62
63
64
65
67
70