Télécharger Imprimer la page

Craftsman 139.18452D Manuel D'instructions page 13

Masquer les pouces Voir aussi pour 139.18452D:

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements. Do not install the header bracket over
drywall. If installing into masonry, use concrete
anchors (not provided).
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with the
bottom edge of the bracket on the horizontal line as
shown (with the arrow pointing toward the ceiling).
• Mark the vertical set of bracket holes. Drill 3/16" pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
HARDWARE SHOWN ACTUAL SIZE
CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is
pointing away from the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark the side holes. Drill 3/16" pilot holes and fasten
bracket securely to a structural support with the
hardware provided.
Lag Screw
5/16"-9x1-5/8"
Ceiling Mounting Holes
Header
Wall
2x4
Structural
Support
Horizontal
Line
Highest Point of
Garage Door Travel
Header
Bracket
6" (15 cm) Maximum
Door
Spring
UP
Garage Door
13
Wall Mount
UP
Optional
Mounting Holes
Header
Bracket
Garage
Door
Vertical
Centerline
of Garage Door
– Finished Ceiling –
Vertical Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Vertical
Centerline
of Garage Door
Vertical
Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Door Spring
Header Wall

Publicité

loading

Ce manuel est également adapté pour:

139.18451d139.18453d139.18473d