EN
Installing the RAUSIKKO Boxes
Inserting the front grille
For the connection of an AWADUKT PP DN 110, 160 or 200 sewer pipe to
the front end of a Box infiltration tank the appropriate saw matrix on the
front grille is sawed out with the aid of a jig saw. The KG pipe spigot is then
inserted.
32
The front ends of the gravel trench
are closed with a front plate.
The sheets with dimensions W × H =
0.28 × 0.30 are provided with a saw
matrix for the connection of KG pipes
DN 110 to DN 200.
The grid plates are provided with
clips and are inserted into the front
sides of the Boxes. No other
connecting elements are required.