EN
When building percolation systems with RAUSIKKO Boxes no gravel is
required to fill the gravel trench as with conventional pipe trenches.
When assembling multi-layer Box systems the Boxes are fixed on top of each
other using integrated push-fit socket connections.
Push-fit socket connection on the top and bottom of the Box
When fixing together multi-layer Box systems, connecting clips may also be
used.
Connecting clip
25