installation and fi nishing
EN
10. Install the log set (see "log installation" section for details).
11. Re-install the glass door (Fig. 3-12 and 3-13).
12. Re-install the front decorative cover held in place by 2 magnets (Fig. 3-14).
3.5
log installation
WARNING
!
•
Power supply service must be completed prior to fi nishing to avoid reconstruction.
•
Heat vents and air openings cannot be covered in any circumstances.
COMPLETED LOG SET. CAREFULLY READ THE NEXT PAGES FOR INSTALLATION DETAILS.
14
W415-4035 / 03.23.22
Logs hidden
Slot
Framing
hidden for
clarity.
Fig. 3-13
for clarity.
Fig. 3-12
Framing
hidden for
clarity.
Fig. 3-14