Toto DuoFit WT173M Manuel D'installation Et D'utilisation page 6

Système de réservoir mural
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

For vertical drain installation, clip the
upper bracket to the front slot of the
frame as shown.
Front Slot
4. Drill pilot holes in the wood frame
Mark
Mark the location for drilling pilot holes for the screws to secure the carrier to the
wood frame.
There are six (6) screws for the side (3 on each side) and two on the feet. Make
sure the carrier is flush with the wood frame before placing the markings.
Remove the carrier from the wood frame, drill six (6) 1/8"(3mm) holes on the wall
stud (Trimmer/Jack) and two (2) on the subfloor (plywood); for concrete, drill 3/8"
(10mm) holes for anchors.
A
A
A
3. Install the upper bracket
Back Slot
A
A
A
B
B
For left or right drain installation, clip
the upper bracket to the back slot of
the frame as shown.
45°
A
1
B
1
6
45°
dia.1/8"
( Ø 3mm )
2
2
dia.1/8"
( Ø 3mm )

Publicité

Table des Matières
loading

Table des Matières