3
Installation
B
In case the information which are
given in the user manual are not
taken into account, manufacturer
will not assume any liability for this.
Points to be paid attention
to when the relocation of
the cooler/freezer
1. Your cooler/freezer should be
unplugged.Before transportation
of your cooler/freezer, it should be
emptied and cleaned.
2. Before it is re-packaged, shelves,
accessories, crisper, etc. inside your
cooler/freezer should be fixed with
adhesive tape and secured against
impacts. Package should be bound
with a thick tape or sound ropes
and the transportation rules on the
package should be strictly observed.
3. Original packaging and foam
materials should be kept for future
transportations or moving.
Before you start the
cooler/freezer,
Check the following before you start
to use your cooler/freezer:
1. Attach 2 plastic wedges as
illustrated below. Plastic wedges
are intended to keep the distance
which will ensure the air circulation
between your cooler/freezer and
the wall. (The picture is drawn up
as a representation and it is not
identical with your product.)
2. Clean the interior of the cooler/
freezer as recommended in the
"Maintenance and cleaning" section.
3. Connect the plug of the cooler/
freezer to the wall socket. When the
fridge door is opened, fridge internal
lamp will turn on.
4. When the compressor starts to
operate, a sound will be heard. The
liquid and gases sealed within the
refrigeration system may also give
rise to noise, even if the compressor
is not running and this is quite
normal.
5. Front edges of the cooler/freezer
may feel warm. This is normal. These
areas are designed to be warm to
avoid condensation.
Electrical connection
Connect your product to a grounded
socket which is being protected by a
fuse with the appropriate capacity.
Important:
The
connection
compliance with national regulations.
• The power plug must be easily
accessible after installation.
• Electrical safety of your cooler/
freezer shall be guaranteed only
if the earth system in your house
complies with standards.
11
EN
must
be
in