Connect the appliance to the gas supply pipe, interposing a stop valve which enables
the appliance to be insulated from the rest of the installation.
Check the supply pressure using a manometer when all the burners are lit. It must be
equal to the indications on the rating plate.
The fresh air flow required for combustion air supply is:
- PSR 400 G
6.4 m3/h
- PSR 600 G
12.8 m3/h
- PSR 900 G
19.2 m3/h
General conditions of installation
The installation and maintenance of the appliance must be carried out in compliance
with the statutory texts and good practices in force, mainly:
General specifications
For all appliances:
Article GZ Installation with combustible gases and liquefied hydrocarbons.
Then, according to use:
Article CH Heating, ventilation, refrigeration
Air conditioning and domestic hot water steam generation.
Article GC Installation of appliances to be used for catering
Specific provisions for each type of establishment to which the public is admitted
(hospitals, shops, etc )
Important: Never change the diameter of the injectors.
17