Putting Into Operation - Abicor Binzel ABIPLAS WELD 250 M Mode D'emploi

Masquer les pouces Voir aussi pour ABIPLAS WELD 250 M:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation

6 Putting into operation
6.1 Setting up the
EN - 10
form. The arc and the molten pool are protected by inert gas or active gas
components. The cable assembly serves as a supply line and is equipped with
all connection elements.
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to for the entire duration of
maintenance, servicing, disassembly and repair work:
• Switch off the power source.
• Close the gas supply.
• Close off the coolant supply.
• Disconnect all electrical connections.
DANGER
Risk of injury and device damage when handled by
unauthorised persons
Improper repair work and modifications to the product may lead to serious
injuries and damage to the device. The product warranty will be rendered
invalid if work is carried out on the product by unauthorised persons.
• Operating, maintenance, cleaning and repair work must only be carried
out by qualified personnel (in Germany, see TRBS 1203).
NOTICE
• Please take note of the following instructions:
 3 Product description on page EN-5
®
WELD 250 MT torch body
ABIPLAS
CAUTION
Risk of injury
Puncture or stab wounds may be caused by the tungsten electrode tip.
• Keep your hands out of the danger zone.
• Wear the correct protective gloves.
®
ABIPLAS
WELD 250 MT
BAL.0311 • 2018-02-05

Publicité

Table des Matières
loading

Table des Matières