Télécharger Imprimer la page

Zephyr APEX DAP-M90AMBX Notice D'utilisation page 12

Publicité

Les langues disponibles

Les langues disponibles

5. Secure capacitor box connected to the
provided cable to the blower plate using
(2) screws included with the blower. See
Fig.5
6. Secure Green/Yellow ground wire con-
nected to the cable to the provided ca-
pacitor to blower plate. Fig.6
7. Open the front panel, Fig.7
NOTE! Open the front panel while holding
it by its external sides, as shown in Fig.7,
and keep at a suitable distance to avoid
impacting it.
8. Attach the 6 pin male molex connector
from blower wire to the 6 pin female mo-
lex connector located inside the blower
housing. See Fig.8
9. Install the blower and plate on the inside
of the blower housing: carry out the in-
structions at step 2 in reverse order then
use the screws provided to complete in-
stallation. (Tot. 12). Fig.9
- 12 -

Publicité

loading

Ce manuel est également adapté pour:

Apex dap-m90amwx