The plastic spacer sleeve may be shortened to the thickness of the insulation.
6.
IDENTIFICATION
All system components of the Secupin fall protection system are identified with the manufacturer's logo and the
necessary information for each user. Each SECUPIN anchor point carries the manufacturer's logo and serial number
on rod or tube.
Furthermore, the proper identification must be applied prior to installing the anchoring eyelet AP-068-1 by means of
an X in the form of a punched letter in accordance with the number of users shown in the assembly instructions
using the designated identification field. Thereafter, the anchoring eyelet contains all necessary information for the
user and the anchoring eyelet can be installed.
7.
INSTALLATION OF ANCHOR EYELET
Remove the locknut, the A2 washer, and the plastic washer (the lower plastic washer remains on the thread).
Attach the anchoring eyelet with the lettering at the top. Position the second plastic washer and the A2 washer.
Tighten the nut (see figure) and then slightly loosen the nut so that the anchoring eyelet can be rotated freely
around the rod.
8.
MAINTENANCE
8.1 Inspection
The installed anchor point SPA-TYPE-10-L must be checked by a technical expert as necessary (contamination,
damage), however, at least once a year.
MAT-MA-0023-EN SECUPIN
23/01/2015
Page 6 of 12