2.Electronic watch and column connection: as shown in the figure below, the B.M8 * 16
and C flat pads are respectively assembled into the left and right columns and electronic
watch holes and tightened with the Toolkit MS wrench.
Step 3
Once the machine is assembled, connect the power supply and turn on the machine
EN
switch, place the safety lock and it is ready for use.The meter of this product can be
adjusted to 40° according to the customer's needs, as shown in the figure below, (an IP
or mobile phone can be placed in the meter placement rack position).
4