Installation and start-up of KEOR HPE UPS 200-250-300 kVA
Installation et démarrage de l'ASI KEOR HPE 200-250-300 kVA
Installazione e avviamento KEOR HPE UPS 200-250-300 kVA
Picture 15 – Battery start-up
Operation on BCB switch
The switch BCB, located in the external battery cabinet, can only be closed if the DC
voltage is in tolerance. Serious damages both to the battery and the equipment may
occur if the breaker is closed before the front panel requires it.
5)
Close the UPS output switch OCB to connect the UPS to the load bus. After this operation
the start-up is completed and the display will show the final mimic diagram.
Picture 16 – Connecting the UPS to the load
OMP06262 REV. E
45