Télécharger Imprimer la page

Miele PDR 516 SL EL Schéma D'installation page 20

Masquer les pouces Voir aussi pour PDR 516 SL EL:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
en - Installation notes
20
Unscrew Torx screws (Torx T 20 and T 30) from the wooden pallet
and remove the wooden battens.
Remove the wooden battens.
Lift the tumble dryer with the pallet truck.
Fit the 4 adjustable feet supplied.
Installing the tumble dryer
Place the tumble dryer on a perfectly level, secure and horizontal
surface that is able to withstand the specified floor load.
The floor load created by the tumble dryer is concentrated and
transferred to the installation surface via the machine feet. A base is
not required. However, an uneven floor surface must be com-
pensated for.

Publicité

loading