22
I U K
OPERATOR INSTALLATION
1) Fasten the operator checking that it is exactly positioned 15 - 16 .
2) At this stage it is advisable to grease the operator output shaft and the lever fastening pins.
3)Assemble the mechanical limit switch on the connecting rod 20
4) Assemble rod and pins using the cotters provided 21 .
5) If you use some electrical limit switches, refer to next paragraph before going on.
LIMIT SWITCH FITTING AND ADJUSTMENT
1) Fit the two cheese-headed screws e 18 directly on the operator body.
2) Fasten the sensor board c
to run the output cable through the grooves on the operator.
3) Taking the sensor as reference, assemble the two limit switches 19 on the disc 20 using the screws provided.
Fasten the first one in the gate-open position and the second one in the gate-closed position, moving the leaf by
hand (it is possible only if the output lever is not fastened with the suitable plug).
There are several seats on the limit switches where you can position the magnets spaced out 5°; if you use two
magnets (deceleration enable and end of motion), it is recommended to always leave at least two empty seats
between the two magnets.
Be sure to remove and put the magnets on without turning them.
If the sensor fails to read, appropriately adjust its height by loosening the retaining screws f
unscrewing the cheese-headed screws e 18 . When done, tighten the retaining screws f
In any case always refer to control unit instruction for limit switches management
START-UP
• Program the circuit board as required following the relative instructions.
• Power the operator and check the LED status as indicated in the table in the instructions for the electronic part.
TESTING THE AUTOMATED DEVICE
Carefully test the automated device as well as all the accessories connected to it.
Give the customer the instructions for use and demonstrate proper functioning and use of the device, the safety
devices, cautions and warnings.
MANUAL OPERATION
Should it be necessary to manually operate the gate, use the manual key unlocking device
N.B.: t
he unlocking operations must be carried out only in the case of an emergency and especially with the
power DISCONNECTED
[
]
[18]
using the two screws f
[
]
.
[
] [
]
[
].
[
]
[
]
18 above the two screws e 18 , paying attention
[
]
GROUND
[
]
[
]
[
]
18 and screwing or
[
]
18 .
.