Télécharger Imprimer la page

GiBiDi GROUND 610 Instructions D'installation page 20

Publicité

Les langues disponibles
  • FR

Les langues disponibles

20
I U K
PRELIMINARY WARNINGS
Check that the gate structure is in conformity with the regulations in force and that the gate movement is linear without
friction.
Preliminary checks
• Check that the gate structure is sufficiently robust. In any case check that the gate weight and dimensions fall
within the operating limits of the operator.
Maximum leaf length:
2.5 m - maximum weight: 600 kg
3.5 m - maximum weight: 400 kg (it is recommended to use an electric lock).
• Check that the leaf can be moved manually without force (points of greatest friction) for the entire travel of the gate
during both opening and closing.
• Maximum cable length 10 m.
• Check that the area where the gearmotor will be fitted is not exposed to flooding.
• If the gate is not a new installation, check the state of wear of all the components, repair or replace the defective or
worn parts and perform any other operations necessary.
The reliability and safety of the automated device is directly dependent on the condition of the gate structure.
DESCRIPTION [
À Foundation box
Á Motor unit
 Limit switch unit
(610)
à Rod and output lever unit
Ä Support lever and leaf release unit
Å Cover
INSTALLATION
1)
Based on the type of structure and desired opening, decide on the exact position for the operator following the
type indications
.
2)
Dig a foundation hole in the appropriate position and large enough to fit the operator 7
3)
Provide for a water drain to prevent stagnation and subsequent oxidation in the foundation box 9
:
]
5a
DESCRIPTION [
À Foundation box
Á Motor unit
à Rod and output lever unit
Ä Support lever and leaf release unit
Å Cover
GROUND
]
5b
[ ]
.
[ ]
.

Publicité

loading

Ce manuel est également adapté pour:

Ground 634