Télécharger Imprimer la page

Etac Molift Mover 180 Manuel D'utilisation page 8

Masquer les pouces Voir aussi pour Molift Mover 180:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 100
Molift Smart 150 / www.etac.com
Charge the battery. The battery must not be in
the battery holder during assembly!
Lifting column
Place lifting column in chassis.
Lock the lift column in place by fastening the
two hexagon socket screws in front and rear of
the chassis.
Screws will ensure that the column
cannot be pulled upwards. Do not use
lifter unless the screws are mounted
correctly.
Mounting sling bar
1. Align sling bar in connection point.
2. Push button on locking pin and insert all the
way through.
3. Make sure locking pin is properly fastened
4. Push button and push bolt from opposite side
while holding in button to remove locking pin.
All manuals and user guides at all-guides.com
Assembly
Battery and hand control
1. Connect hand control to bottom of battery
2. Insert battery with terminals facing down.
3. Connect hand control wire to push handle
Checklist after assembly
Use this checklist to verify that the lifter is properly
installed and can operate correctly and safely
before use.
8
holder.
bracket so it does not fall to the floor when
dropped.
Do not start using lifter before
completing control according to
checklist after assembly.
Ensure that the lifting arm, lifting column and
sling bar are properly fixed and that there are
no loose parts on the lifter.
Make sure battery is charged (no lights on the
battery lamps).
Check that the lifter has no apparent damage
or other faults.
Perform one lift with load (60-80 kg)

Publicité

loading