Included with the product
1 x 90-degree connection
1 x Ventilation pipe 40 cm
(15.75")
Sample drain cleaner
Sample Compostable wastebags Tiny
Sample Absorb pad
1 x Urine bowl extension
3 x Mounting screws for wall or
floor mountings
1 x Lid for solid waste container
1 x Adaptor ventilation pipe 50
mm to 1.5" (schedule 40)
1 x Basket for bioblock
1 x Pipe cap with insect net
50 mm/1.5"
1 x Ventilation cowl 50 mm/1.5"
2 x Screw for ventilation cowl
1 x Installation template
1 x Power adapter
1 x Fan filter
1 x Urine hose
1 x Straight joint 32 mm pipe
1 x 90-degree joint
32 mm pipe
4
Installation steps
Please read more under each heading
1. Toilet placement
2. Make holes according to the installation template
3. Install ventilation pipe
4. Install urine hose
5. Install ventilation pipe cap or ventilation cowl
6. Power supply for toilet
7. Connect the toilet to the ventilation pipe and urine tube
8. Fix the toilet to the wall and/or floor
9. Install fixed fan filter
10. Place basket in the urine drain
5